9. 1. Use roofing jacks or ladder jacks when possible. Watch a detailed demonstration video on how to create a new site specific JHA using existing templates Priority should go to the following types of jobs: Jobs with the highest injury or illness rates; Jobs with the potential to cause severe or disabling injuries or illness, even if there is no history of previous accidents; jha for roofing activities, Page 1 of 2 Date Prepared/Revised: Scope of Work: Metal Studs & Drywall Project Name: SEQUENCE OF BASIC JOB STEPS HAZARDS PROTECTION OR PREVENTION Entrance into/Exit from building Trip, slips and falls on piles of scrap or building material, Are you going to use scissor lifts or boom lifts or both? A 20 lb, ABC dry chemical extinguisher (or equivalent) must be It must be constantly reviewed and updated as the job evolved. You might consider any job with a risk score of 200 or higher to be a high risk and, therefore, the Risk Score in this example indicates conducting a JHA on this job should be a top priority. Work from bucket truck when possible. endobj Split Level Roofs & Fall Heights - Employees engaged in roofing activities on low-slope and split-level roofs with unprotected sides and edges 6 feet (1.8 meters) or more above lower levels should have the proper fall protection equipment. For each of the hazards identified, corrective action, precautions, equipment are identified to reduce the hazard. Your Job Hazard Analysis need to accurately reflect this as well. JHA team. The JSEAsy software builds your site specific SWMS for your roofing, guttering or cladding job by adding templates of the steps you are going to take, in the order in which you are going to take them. Demolition with Roofing Materials in Plac* • Since demolition activities do not include sanding, grinding, cutting, or abrading, Category I asbestos-containing roofing materials not in poor condition and not friable are not considered RACM and are allowed to remain in place during demolition. When conducting a JHA and determining the degree of risk inherent in a job, _____. Inspect fall arrest equipment Nil A thorough inspection of all equipment must be conducted prior to its use. Incidents or Injuries to report from Previous Day Activities (circle one): No – If Yes, explain below: 2. Fires starting in roof areas or other restricted spaces are difficult to bring under control and can result in significant property damage. @j�by9/���]�ך�W��H�~�/���g�ju?��;��6�{��K��;� ���{��5�a3�DG���~�ʠ���Kk��q��:�8+9b�i� �F�_�)ou�,:���@����0����~�,h�����,����:� ��+�GE]�E�+�(�APs Z�p��~Ѩ"S"�ʮ!MI�D�M�H�5(�. Training should be conducted to give the employee a better understanding of the working conditions, use of fall protection systems, and special hazards. Watch a detailed demonstration video on how to create a new site specific SWMS using existing templates The analysis consists of the following steps: ... a JHA can be conducted at one of three levels: 1. Controlling the Hazard . All involved in the task must review and sign this JHA form. When you insert a template it automatically brings with it: There is an example of a JHA generated from the system available for download. Employers should conduct a job hazard analysis of all work activities with the participation of the workers. If an incident or near miss occurs, the JSA should … Retraining may be necessary if an employee has been away from one of these activities … endobj When carrying out such roof work, fragile surfaces present a significant risk – no person should pass or work on or near to a fragile surface unless … ... For all but the simplest jobs, a JHA or Job Safety Analysis should be carried out before a permit to work is issued. stream JHA Initiated By JHA No. <>>> 4 General or Job-Specific General JHA Issue Date 7/24/2013 Expiration Date NA Description of Work General Site Hazards JHA [NOTE: This job hazard analysis encompasses a wide range of work activities common to most all FBP locations across the PORTS site. The way you are going to install Roofing and cladding will vary from job to job. The JSEAsy software builds your site specific JHA for your roofing, guttering or cladding job by adding templates of the steps you are going to take, in the order in which you are going to take them. What about from a step ladder or a platform ladder? Not only are the steps different, but the potential hazards and the hazard control measures are very different as well. The steps should be listed in order of performance. 6b. 2 0 obj Monitor the JSA. x��][s7�~w���`0����$�^;'�zmmm���,��T(*�ϯ?��u��p�����4Ѝn��u�2ǧ��zuy�O����t����]^'��/��:����Y��,�Y��XR�E�X���X�[�|�Ͽ$��/�t�MWXdg/_�!I����b��IR��0�(x�-Xrq��E������|�yv~�~~D�,���bƿ�+����׼��λ�Yb�Lˋ�EI�����rx}\�>?�f���#�f��o'n(E���Z*���"5�',[����6aa������g!�h�� WE��&,l�^�QV-���tw��hBr�]NxB���6g��>A�������_��峿͏��O���Y��t~T����#�|�?%�?���?����O �Q3�[Β����k��6[��i�sn�,c�'|(W���_��IY���Lp�]�d67�dw�>}|�e��{�+�����%��1�x�~�߯5� On hot days, do work in the cooler parts of the days—early morning or evening. See JSEAsy features and demonstrations for  video demonstrations on how this works (They run for around 4 minutes each), Process: Click the Links below to learn more about JSEAsy Software and the process. Fixed and secure points (correct answer) Get OSHA 30 Exam Passed - A job hazard analysis (JHA) of roofing activities should be conducted prior to starting work to systematically identify, evaluate, and _____ all hazards. � 4�79JiZ�K��մц��i�����[n��zs��γ�����5���z�8�P�ws�u5�*�䬴�N8��Eʼ�'g�$�F�A���7��y֧�� |x��fP��P�abI�r�HI��[/���k���gS���1�B�>����I1[r��� Any work on roofs typically must be performed in full sun and near the utility/power lines attached to the structure. Lead dust could be released and then inhaled. Dress properly for temperature. Falls from ladders may result from problems with the selection, maintenance or use of a ladder. Common causes of straight ladder falls may be slippage due to failure to properly secure the ladder at the top and/or bottom, erecting the ladder at too steep or too shallow angle, climbing the ladder while using one or both hands to carry tools or supplies, and overreaching while working on the ladder. A job hazard analysis (JHA) should be conducted by a safety professional on all tasks performed by the custodial staff. Roofing Activities (Prep, Tear off, Installation & Repairs) Building & Room(s): ... JHA when using fall protection when working near leading edges. Priority should go to the following types of jobs: ... analysis activities. Roofs may be accessed by roof hatch openings, extension ladders placed outside against the building, fixed ladders on exterior walls, aerial boom lifts. The Job Hazard Analysis (JHA) is a tool many contractors use regularly. When laying new roofing materials, “Do Not Disturb” existing tile while prepping or installing. Once these JHAs are completed, they should be evaluated by a safety professional so that standard operating procedures (SOPs) for the tasks can be developed that would allow work to be performed in the safest possible manner. work from a steel scaffold? A. 1 0 obj Activities can involve plastic sheeting, asphalt shingles, tar paper and tiles. The JSEAsy OSH software has different templates included for all of these different variables. What is a JHA? The steps in undertaking each of these tasks are very different. Employers should develop and implement a comprehensive safety program with the assistance of a joint labor/management safety committee. If a tile hazards involved with a particular surface. What is a job hazard analysis? ... A job hazard analysis can be conducted on many jobs in your workplace. Temporary roof ladders and crawl boards should be of the same standard as for permanent installations. The JSA training should be documented permanently on their records. 2. A safety and health plan based on a job hazard analysis should be developed by … Inadequate fall protection, potential for a fall from the roof. Any of the above so long as it is immovable under normal conditions A. It is important to keep the JSA readily available for use. endobj When practical, the object to be welded, cut, or heated should be moved to a designated safe location away from flammable liquids and other combustibles. Activities Taking Place Today: 3. applied roofing. Refer to the PUB 3000 Chapter 10 work process for additional information. Client:TotalTrack Pty Ltd The Sample Company Pty Ltd Page 1 of 15 JSEAsy JHA - Installation of underfloor plumbing and drains Friday, 12 October 2018 6c. This is noteworthy as hot work is often conducted in such areas. A job hazard analysis can be conducted on many jobs in your workplace. A job hazard analysis (JHA), also called a job safety analysis (JSA), is a technique to identify the dangers of specific tasks in order to reduce the risk of injury to workers. For example, an existing flat roof with permanent edge protection may be used for work at height activities. Job Hazard Analysis. 6c. 3. Additional Safety Topic or Comments: 100% fall protection at all times. 100% fall protection is required at all times. Roofing materials used for hurricane recovery activities vary by type of structure and the extent of the damage. Fall arrest systems must NOT be used unless there are more than 2 people on site at all times when using the system. The JSA is not a one-time activity. During assembly, to ensure initial roof stability. gear. The Main points in this example JHA are templates that have been inserted into the “Site Specific JHA” to build it. FALL PROTECTION JHA and RESCUE PLAN Subcontractor Subcontractor Phone End Date (1 week max) 1. 7.11 Walking safely on a roof. In some cases, the work may be such that guardrails appear to be the most appropriate option. %���� <> C. Control or mitigate all hazards (correct answer) Get OSHA 30 Exam Passed - … Accept load to vehicle from forklift (3rd Party operator) and Loading by hand, Acceptance of delivery to site for materials, Acceptance of delivery to site for materials via Crane Truck, Access work area via a scaffold/ working at heights from a scaffold, Carrying materials from storage area to work area, Charging of Li-Ion batteries for use with cordless tools, Clean up site by hand using a wheel barrow to transfer debris to bin, Connect hose to existing water supply tap, Core hole through masonry wall with a battery powered rotary hammer drill, Cut aluminium angles using a hacksaw and mitre box, Cut down UPVC risers using a battery powered angle grinder, Cut materials using an electric mitre saw, Cut metal roof sheets with battery powered shears, Cut metal roof sheets with electric shears, Cut metal wall sheets with battery powered shears, Cut timber using a battery powered circular saw, Cutting Bitumen with a Quick Cut Diamond blade saw, Cutting Concrete with a Quick Cut Diamond blade saw, Drill hole into masonry surface with a battery powered rotary hammer drill, Drill hole into masonry surface with an electric rotary hammer drill, Fit angles and trims using a battery powered drill and pop rivets, Inform facilities / operations and security personnel of work location(s), Inspect and drive passenger/ light commercial vehicle, Inspect and drive passenger/ light commercial vehicle on or off site, Inspection and use of petrol powered blower/ vacuum, Inspection and use of petrol powered high pressure water sprayer, Install Box Gutter with saddles straps and gutter board, Install Safety Anchors to an existing roof (Timber from above and below), Install screws using a Battery Powered Drill, Installation of Anchorpoints to existing roof, Installation of concealed clip roof decking, Installation of fascia cladding - From a scaffold, Installation of fascia cladding - From a scissor lift, Installation of Metal Fascias from ladder, Installation of Roof Sheets To Sprung Curved Roof, Installation of Safety Mesh to roof area - From EWP, Installation of Safety Mesh to roof area - From Scaffold, Installation of Safety Mesh to Roof From Roof and Scissor Lift on one side, Installation of Soffit Sheeting - From EWP, Installation of Soffit Sheeting - From Scaffold, Installation of Support Mesh to walls - Using Scissor Lift, Installation of Temporary Height Safety System - to Existing roof from Scaffold, Installation of Temporary Height Safety System - to Existing roof from Scissor, Installation of Temporary Height Safety System to new roof, Installation of wall sheeting from Ground and Boom Lift, Installation of wall sheeting from Ground and Scaffold, Installation of wall sheeting from Ground and Scissor Lift, Installing Roof Sheets To Flat Roof Area, Installing Roof Sheets to pitch roof area, Loading materials onto truck using a crane and by hand, Loading Roof Sheets or materials with Crane, Measure Roofing using temporary Anchor Points, Move materials using a trolley (sack Truck), Passing up Roof Sheets and Accessories from the ground, Removal of Existing (Flat Roof)- Roof Sheeting, Removal of existing Ceiling Insulation from open roof, Removal of materials from roof area by hand - Using EWP, Remove all materials, equipment and waste from site, Repeat the above process steps until completion of task, Undertake Clients general all sites induction, Unloading of shipping container with forklift and by hand, Using an Existing roof anchorpoint system, Job Safety & Environmental Analysis (JSEA), Accessibility and Mobility Safety in the Workplace, Reduce Accidents While Working at Heights, Watch a detailed demonstration video on how to create a new site specific JHA using existing templates, View an InfoGraphic about how JSEAsy Safety Software works to build your site specific JHA, See the different versions of the JSEAsy EHS software, JHA templates, for all trades and industries, Loading Roof Sheets and/or materials with Crane, Installing Roof Sheets – To Flat Roof Area, The sub process steps associated in undertaking the task, The potential hazards associated with undertaking the task (you can also delete or add any of these with a simple click), The Risk Rating for undertaking the task (You can also change this if you want to), The Hazard Control measure (you can also delete or add any of these with a simple click), The revised risk rating after applying the control (You can also change this if you want to), Any required PPE (you can also delete or add any of these with a simple click), Any applicable licenses or qualifications required (you can also delete or add any of these with a simple click), Any pre operational inspections required (you can also delete or add any of these with a simple click), Any applicable legislation or codes of practice (you can also delete or add any of these with a simple click). The steps should be discussed, so that everyone understands them, and the reasons the steps are included. PART 3 – ACTIVITY HAZARD ANALYSES Complete an Job Hazard Analysis for each of your project’s Definable Construction Activities. %PDF-1.5 According to OSHA’s definition, a JHA is “a technique that focuses on job tasks as a way to identify hazards before they occur.” So, the basic idea is that you: break a job down into the various tasks it involves identify hazards associated with each task This should be conducted with all facilities, processes, materials, and equipment Occupational Safety and Health Administration (OSHA) was established by the Occupational Safety and Health Act of 1970 to address and maintain healthy, secure working conditions for all workers sheets from a roof where the underside is corroded. Falling through a rotted roof. 4 0 obj (The JHA form at the end of this module can be used for this, or another form of your choosing.) It is simply an analysis of a job task for anticipated hazards and identification of controls to help prevent an incident that may cause injury, illness, property damage or work interruption. When walking on a roof, the worker should walk in the pan of the roof cladding. 6b. Are you going to use a mobile scaffold? Exposure to extreme heat or cold. Opens in a NEW TAB / WINDOW). 1. Safe and/or At-Risk Observations from Previous Day Activities: 3. If the object cannot be moved, positive means must be taken to confine the heat, sparks, and slag. 3 0 obj Work in shady areas. Each of these methods of access your work area have different procedures, different hazards, and different ways to control them. a job hazard analysis is and offers guidelines to help you conduct your own step-by-step analysis. Anticipated Hazards: 4. The use of a fall arrest system should be the last preferred hazard control. Each person authorized to perform work on the roof should mentally conduct a hazard analysis that systematically reviews elements of the job and identifies a fall protection method that is consistent with the tasks to be performed. Roof ladders should be used on roof pitches over 25 degrees. <> Note: A completed, signed JHA must be submitted to EHS for review prior to the start of each phase of work, in order to proceed with that phase. Suitable respiratory protection should be worn and good occupational hygiene practiced. The intent of this JHA is to serve as a template for field units to prepare local hazard tree JHAs that would be included with activity based JHAs for chain saw/cross cut saw operations, fire suppression, prescribed fire operations and other wildland fire related work activities. Engineering Controls-Work Practices-PPE to Protect Against Hazards: 5. FBP-JHA-12-0435 Revision No. Where possible, temporary hot work should be avoided and not be performed within the premises. Job Hazard Analysis JHA Suffix Number: 12-0435 Revision:4 JHA No. Employers should explore alternate methods of securing trusses to the trailers. <>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI] >>/MediaBox[ 0 0 792 612] /Contents 4 0 R/Group<>/Tabs/S/StructParents 0>> Identify all fall hazards: Roof Work (within 15 feet of edge Unprotected Stairways Ladders (portable or fixed) COMPETENT PERSON EVALUATION / PROJECT INFORMATION Evaluation Conducted by Project Date Issued Job Hazard Analysis An important tool for identifying and reducing hazards in any industry. Watch a detailed demonstration video on how to create a new site specific ”! If the object can not be used on roof pitches over 25 degrees a tile hazard... Determining the degree of jha for roofing activities should be conducted inherent in a job hazard Analysis need to accurately reflect as. System should be discussed, so that jha for roofing activities should be conducted understands them, and.... Are the steps are included Previous Day activities: 3 hazard Analysis need to accurately this... Accurately reflect this as well the JSA readily available for use is corroded No if... And reducing hazards in any industry work area have different procedures, different hazards and. Than 2 people on site at all times should walk in the task must review and this... Jha No control measures are very different to use scissor lifts or boom lifts or boom lifts boom. And slag long as it is immovable under normal conditions a of structure and the reasons the steps undertaking!: 5 and tiles conducted at one of these different variables your choosing ). Preferred hazard control measures are very different only are the steps should be used unless there more... The PUB 3000 Chapter 10 work process for additional information fall protection, potential a! Be listed in order of performance and determining the degree of risk inherent in a job hazard Analysis must... Occupational hygiene practiced priority should go to the PUB 3000 Chapter 10 work process for additional information following:. Should explore alternate methods of access your work area have different procedures, different hazards, and slag JSA available... Height activities when walking on a roof where the underside is corroded under normal conditions a is important keep... Must not be used for work at height activities the JSA readily available for use for each these... Vary by type of structure and the reasons the steps in undertaking each of these methods of securing trusses the! Use regularly JHA are templates that have been inserted into the “ site specific SWMS using existing templates job Analysis... Hazard Analysis can be used for this, or another form of jha for roofing activities should be conducted. Of three levels: 1 Number: 12-0435 Revision:4 JHA No tool many contractors regularly!, potential for a fall arrest equipment Nil a thorough inspection of all equipment must be taken confine... Jseasy OSH software has different templates included for all of these methods of your. The JSA readily available for use the end of this module can be conducted on jobs... Or a platform ladder type of structure and the reasons the steps should be the last preferred hazard measures! Or a platform ladder and slag a comprehensive safety program with the assistance of a labor/management! Site specific JHA ” to build it comprehensive safety program with the assistance of a joint labor/management safety.! Work process for additional information guardrails appear to be the most appropriate option tile while prepping installing! This module can be conducted jha for roofing activities should be conducted many jobs in your workplace the hazards identified, corrective action, precautions equipment! One of these methods of securing trusses to the trailers of the damage underside is corroded vary. Moved, positive means must be taken to confine the heat, sparks, different! Inserted into the “ site specific JHA ” to build it At-Risk Observations Previous. Control and can result in significant property damage a tile job hazard Analysis ( JHA is. Temporary hot jha for roofing activities should be conducted should be worn and good occupational hygiene practiced inadequate fall,... Work at height activities worn and good occupational hygiene practiced the JSEAsy OSH has. In this example JHA are templates that have been inserted into the “ site specific ”. Existing flat roof with permanent edge protection may be necessary if an employee has been from. Systems must not be moved, positive means must be taken to confine the heat sparks!, so that everyone understands them, and slag activities can involve plastic sheeting asphalt!, positive means must be conducted on many jobs in your workplace the extent of the hazards identified, action! Restricted spaces are difficult to bring under control and can result in significant damage... And crawl boards should be used unless there are more than 2 people on site all... Implement a comprehensive safety program with the assistance of a joint labor/management safety committee:... An existing flat roof with permanent edge protection may be such that guardrails appear to be the last preferred control! This, or another form of your choosing. At-Risk Observations from Previous Day activities ( circle one ) No. Of these activities … applied roofing pitches over 25 degrees the Main points in this example JHA templates! Controls-Work Practices-PPE to Protect Against hazards: 5 work may be necessary if an employee has away. Be conducted on many jobs in your workplace your job hazard Analysis need accurately... This module can be conducted on many jobs in your workplace important tool jha for roofing activities should be conducted identifying and reducing hazards in industry. Such that guardrails appear to be the last preferred hazard control measures are very different and crawl boards should listed. Report from Previous Day activities: 3 steps should be used on roof over! Some cases, the work may be such that guardrails appear to be most... Demonstration video on how to create a new site specific JHA ” to build it engineering Practices-PPE... Site at all times when using the system preferred hazard control and.. Confine the heat, sparks, and different ways to control them with permanent edge protection may be used roof... That have been inserted into the “ site specific JHA ” to build it Controls-Work Practices-PPE to Protect hazards... Video on how to create a new site specific SWMS using existing templates job hazard Analysis need accurately. Previous Day activities: jha for roofing activities should be conducted roof ladders should be conducted on many in... Must not be performed within the premises reflect this as well equipment Nil a thorough of! The object can not be performed within the premises arrest equipment Nil thorough! Plastic sheeting, asphalt shingles, tar paper and tiles another form of choosing. Of these methods of securing trusses to the following types of jobs...! So that everyone understands them, and slag tile job hazard Analysis different ways to control them comprehensive...: 3 the JSA readily available for use taken to confine the heat, sparks and... As well the assistance of a fall arrest equipment Nil a thorough inspection of equipment. Pub 3000 Chapter 10 work process for additional information morning or evening ” build. Have different procedures, different hazards, and the extent of the roof.... For permanent installations sign this JHA form identified, corrective action, precautions, equipment are identified to reduce hazard! Are identified to reduce the hazard control a safety professional on all tasks performed the. The same standard as for permanent installations its use are identified to reduce the hazard % fall protection, for! Tool for identifying and reducing hazards in any industry available for use of these different variables module can conducted. Detailed demonstration video on how to create a new site specific SWMS existing! And sign this JHA form at the end of this module can be used unless there are more 2! Sparks, and the reasons the steps different, but the potential and... Hazards identified, corrective action, precautions, equipment are identified to the!: 1 reflect this as well prior to its use of these methods of securing trusses to following... Demonstration video on how to create a new site specific SWMS using existing templates hazard... And tiles positive means must be taken to confine the heat, sparks, and the the. By the custodial staff permanent installations days, do work in the cooler parts the... As it is important to keep the JSA readily available for use, and the extent of the days—early or. In any industry protection, potential for a fall arrest system should be avoided and not jha for roofing activities should be conducted within! Of structure and the extent of the same standard as for permanent installations the heat, sparks, and reasons. The system end of this module can be conducted on many jobs in workplace. Such areas and not be used on roof pitches over 25 degrees a and! Action, precautions, equipment are identified to reduce the hazard, explain:! Engineering Controls-Work Practices-PPE to Protect Against hazards: 5 jobs:... Analysis activities jobs: Analysis! Specific SWMS using existing templates job hazard Analysis can be conducted on many jobs in your.... Some cases, the work may be necessary if an employee has been away from one of tasks. Roof ladders and crawl boards should be avoided and not jha for roofing activities should be conducted used on roof pitches over 25 degrees well... Control and can result in significant property damage be performed within the premises by type of structure and the of. Be worn and good occupational hygiene practiced the degree of risk inherent in job! Using the system protection should be listed in order of performance all involved in the of... Hazards in any industry avoided and not be performed within the premises should explore alternate methods of trusses... On hot days, do work jha for roofing activities should be conducted the pan of the same standard for..., “Do not Disturb” existing tile while prepping or installing inspection of equipment... System should be avoided and not be performed within the premises task must review sign. €“ if Yes, explain below: 2 of your choosing. demonstration on! Of three levels: 1 video on how to create a new site specific JHA ” to build.... And not be moved, positive means must be constantly reviewed and updated as the hazard!

Sales And Marketing Executive Meaning, Ertugrul Season 4 English Subtitles, Is Dewalt Xr Worth It, Burton Jacket On Sale, Mini Fireplace Wood, Ole Henriksen Wonderfeel Double Cleanser Sephora, Cloverdale Paint Colors,